Subsurface Stabilization by Grouting of a Simulated Underground Tank
A moisture barrier using water, sodium silicate, formamide, calcium chloride and penechem with a gel time of one-half hour was constructed around a simulated tank 10 feet deep by 10 feet diameter in the subsurface of the 200 West Area. As a test of the moisture barrier integrity, the volume which would normally be occupied by a tank was excavated and filled with water. The barrier was unable to contain the water. The failure to achieve a water-tight barrier was attributed to a leak in the floor grout. (ERA citation 03:016931)
Subsurface Stabilization by Grouting of a Simulated Underground Tank
A moisture barrier using water, sodium silicate, formamide, calcium chloride and penechem with a gel time of one-half hour was constructed around a simulated tank 10 feet deep by 10 feet diameter in the subsurface of the 200 West Area. As a test of the moisture barrier integrity, the volume which would normally be occupied by a tank was excavated and filled with water. The barrier was unable to contain the water. The failure to achieve a water-tight barrier was attributed to a leak in the floor grout. (ERA citation 03:016931)
Subsurface Stabilization by Grouting of a Simulated Underground Tank
P. J. Wiater (Autor:in) / B. A. Higley (Autor:in)
1977
34 pages
Report
Keine Angabe
Englisch
Engineering Index Backfile | 1954
|Grouting slurry and underground pipeline grouting method
Europäisches Patentamt | 2022
|Engineering Index Backfile | 1954
|Subsurface grouting of hospital site
Engineering Index Backfile | 1950