Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Acoustic Emission on Cofferdam Distress Warning System and Ancillary Acoustic Emission Monitoring; Melvin Price Locks and Dam. Phase 3
A research program was conducted to develop a cofferdam distress warning system and monitor the acoustic emissions generated by the third-phase cofferdam of the Melvin Price Lock and Dam. The purpose of this study was to extend existing understanding of acoustic emission (AE) within large sheet-pile cell stractures to the design, configaration, and operation of a cofferdam Distress Warning System (DWS) capable of automatic operation for an extended period and to correlate the acoustic emissions with the forces acting on the cofferdam. (MM).
Acoustic Emission on Cofferdam Distress Warning System and Ancillary Acoustic Emission Monitoring; Melvin Price Locks and Dam. Phase 3
A research program was conducted to develop a cofferdam distress warning system and monitor the acoustic emissions generated by the third-phase cofferdam of the Melvin Price Lock and Dam. The purpose of this study was to extend existing understanding of acoustic emission (AE) within large sheet-pile cell stractures to the design, configaration, and operation of a cofferdam Distress Warning System (DWS) capable of automatic operation for an extended period and to correlate the acoustic emissions with the forces acting on the cofferdam. (MM).
Acoustic Emission on Cofferdam Distress Warning System and Ancillary Acoustic Emission Monitoring; Melvin Price Locks and Dam. Phase 3
1995
189 pages
Report
Keine Angabe
Englisch
Hydrology & Limnology , Geology & Geophysics , Civil Engineering , Acoustics , Fluid Mechanics , Acoustic emissions , Pile structures , Head(Fluid mechanics) , Dams , Locks(Waterways) , Hydrostatic pressure , Acoustic channels , Geophones , Preamplifiers , Impact , Stress analysis , Monitoring , Leakage , Field tests , Reports , Strains , False alarms , Seismic detection , Sensitivity , Power supplies , Calibration , Rivers , Floods , Rainfall , Elevation , Site investigations , Mississippi River , Friction , Collisions , Light emitting diodes , Barges , Warning systems , Multichannel , Channel selectors , Cofferdams , Melvin Price Locks and Dam , Distress warning system , Sheet piles , Impact loads
Dewatering Cofferdam for Construction of Olmsted Locks
British Library Online Contents | 2002
|Dewatering Cofferdam for Construction of Olmsted Locks
Online Contents | 2002
|Taylor & Francis Verlag | 1995
Online Contents | 1995