Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Roof Blisters, Physical Fitness Building, Fort Lee, Virginia
The blisters on this 2-year old roof were first noticed one year after construction. Findings show that all blisters were built into the roof and that they will continue to develop in size and number. Currently, this roof is watertight, but leaks will occur as blisters begin to break. Rather than wait for problems, recommendations are provided for using a CRREL-designed pressure relief valve to prevent blisters from growing and ever becoming a problem.
Roof Blisters, Physical Fitness Building, Fort Lee, Virginia
The blisters on this 2-year old roof were first noticed one year after construction. Findings show that all blisters were built into the roof and that they will continue to develop in size and number. Currently, this roof is watertight, but leaks will occur as blisters begin to break. Rather than wait for problems, recommendations are provided for using a CRREL-designed pressure relief valve to prevent blisters from growing and ever becoming a problem.
Roof Blisters, Physical Fitness Building, Fort Lee, Virginia
C. Korhonen (Autor:in) / J. Bayer (Autor:in)
1986
19 pages
Report
Keine Angabe
Englisch
Engineering Index Backfile | 1941
|Commissary Sergeant's Quarters, Building 42, Fort Myer, Virginia
British Library Conference Proceedings | 2001
|Fort Myer, Virginia: Historic Landscape Inventory
NTIS | 1998
|British Library Online Contents | 2003
Deep Foundation Underpinning Support for Fort Monroe, Virginia YMCA Historic Building Renovation
British Library Conference Proceedings | 2002
|