Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Effect of slug rupture considerations on C Pile power level limits
This memorandum discusses slug rupture frequency which appears to be a factor that may limit the power level of C Pile. Since additional exposure of Group 8 uranium slugs has increased the available information on the behavior of material similar to that which will be charged into C Pile, a review of this tube power limitation has been made. Utilization of additional data has been possible by use of the revised method of calculating rupture rates discussed in reference (2).
Effect of slug rupture considerations on C Pile power level limits
This memorandum discusses slug rupture frequency which appears to be a factor that may limit the power level of C Pile. Since additional exposure of Group 8 uranium slugs has increased the available information on the behavior of material similar to that which will be charged into C Pile, a review of this tube power limitation has been made. Utilization of additional data has been possible by use of the revised method of calculating rupture rates discussed in reference (2).
Effect of slug rupture considerations on C Pile power level limits
L. W. Lang (Autor:in)
1952
8 pages
Report
Keine Angabe
Englisch
C pile slug rupture detection system
NTIS | 1952
|Slug rupture outbreak at H Pile
NTIS | 1954
|SLUG FOR SLUG PILE CONSTRUCTION AND CONSTRUCTION METHOD OF SLUG PILE
Europäisches Patentamt | 2017
|Recommended C Pile power level limits
NTIS | 1952
|Limits of pile operating level
NTIS | 1950
|