Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Superfund Record of Decision (EPA Region 10): Idaho National Engineering Laboratory (USDOE), Operable Unit 3-13, Idaho Falls, ID., September 28, 1999
The Idaho Nuclear Technology and Engineering Center (INTEC) (formerly the Idaho Chemical Processing Plant) Waste Area Group (WAG) 3 is one of 10 Idaho National Engineering and Environmental Laboratory (INEEL) WAGs identified in the Federal Facility Agreement and Consent Order (FFA CO) by the U.S. Department of Energy Idaho Operations Office (DOE-ID), the U.S. Environmental Protection Agency (EPA) Region 10, and the Idaho Department of Health and Welfare (IDHW). Operable Unit (OU) 3-13 is listed as the 'WAG 3 Comprehensive Remedial Investigation (RI) Feasibility Study (FS)' in the FFA/CO (DOE-ID 19991). The objective of the comprehensive R1/FS is to: (1) review previous WAG 3 investigations, (2) investigate release sites not previously evaluated, (3) determine the risks posed by individual release sites and the overall risk posed by individual release sites and the overall risk posed by the WAG, and (4) identify, screen, and analyze remedial alternatives for release sites where risks are determined to be greater than allowable levels.
Superfund Record of Decision (EPA Region 10): Idaho National Engineering Laboratory (USDOE), Operable Unit 3-13, Idaho Falls, ID., September 28, 1999
The Idaho Nuclear Technology and Engineering Center (INTEC) (formerly the Idaho Chemical Processing Plant) Waste Area Group (WAG) 3 is one of 10 Idaho National Engineering and Environmental Laboratory (INEEL) WAGs identified in the Federal Facility Agreement and Consent Order (FFA CO) by the U.S. Department of Energy Idaho Operations Office (DOE-ID), the U.S. Environmental Protection Agency (EPA) Region 10, and the Idaho Department of Health and Welfare (IDHW). Operable Unit (OU) 3-13 is listed as the 'WAG 3 Comprehensive Remedial Investigation (RI) Feasibility Study (FS)' in the FFA/CO (DOE-ID 19991). The objective of the comprehensive R1/FS is to: (1) review previous WAG 3 investigations, (2) investigate release sites not previously evaluated, (3) determine the risks posed by individual release sites and the overall risk posed by individual release sites and the overall risk posed by the WAG, and (4) identify, screen, and analyze remedial alternatives for release sites where risks are determined to be greater than allowable levels.
Superfund Record of Decision (EPA Region 10): Idaho National Engineering Laboratory (USDOE), Operable Unit 3-13, Idaho Falls, ID., September 28, 1999
1999
516 pages
Report
Keine Angabe
Englisch
Radiation Pollution & Control , Solid Wastes Pollution & Control , Water Pollution & Control , Radioactive Wastes & Radioactivity , Environment , Environmental Management & Planning , Superfund , Hazardous materials , Land pollution control , Low-level radioactive wastes , Idaho National Engineering Laboratory , Radioisotopes , Polychlorinated biphenyls , Buildings , Soil contamination , Excavation , Waste disposal , Backfills , Ground water , Aquifers , Waste storage , Water pollution monitoring , Storm water runoff , Drainage systems , Waste management , Restrictions , Remedial action , Idaho , Record of Decision , Idaho Nuclear Technology and Engineering Center , Idaho National Engineering and Environmental Laboratory , Idaho Falls(Idaho) , Bonneville Country(Idaho) , WAS(Waste Area Group) , Cleanup operations
Idaho National Engineering Laboratory, Idaho
British Library Conference Proceedings | 1995
|