Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge Deck Program
The purposes of the report are threefold. First, it provides a summary on the completion status of the Washington State Department of Transportation (WSDOT) 'Bridge Deck Program.' Second, it includes information on technical advances in materials and construction techniques used by WSDOT to rehabilitate bridge decks. Finally, it provides an overview on the future direction of the program with an emphasis on rapid construction.
Bridge Deck Program
The purposes of the report are threefold. First, it provides a summary on the completion status of the Washington State Department of Transportation (WSDOT) 'Bridge Deck Program.' Second, it includes information on technical advances in materials and construction techniques used by WSDOT to rehabilitate bridge decks. Finally, it provides an overview on the future direction of the program with an emphasis on rapid construction.
Bridge Deck Program
1990
78 pages
Report
Keine Angabe
Englisch
Bridge Deck Program Development
NTIS | 1985
|Bridge Deck Program (August 1992)
NTIS | 1992
STEEL PLATE DECK BRIDGE EVALUATION APPARATUS, STEEL PLATE DECK BRIDGE EVALUATION METHOD, AND PROGRAM
Europäisches Patentamt | 2020
|CONSTRUCTION METHOD OF BRIDGE DECK SLAB ASSEMBLY FOR BRIDGE DECK SLAB AND BRIDGE DECK SLAB
Europäisches Patentamt | 2018
|Construction method of bridge deck slab, bridge deck slab and bridge
Europäisches Patentamt | 2022
|