Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hilfiker Retaining Walls with Full Height Cast-in-Place Panels
Construction of retaining walls utilizing full height panels introduces a degree of indeterminacy to the structure. The ability to effectively analyze the internal behavior of such systems, and limited field performance, qualifies them as appropriate to the experimental category. Arizona recently utilized the technique for building three permanent earth retaining structures at the interchange of I-10 and 24th Street in Phoenix, Arizona. The construction technique chosen was the Hilfiker Reinforced Soil Embankment with cast-in-place concrete facing. The construction of the N.E. Wall started in September 1986 and finished in January 1987, while the construction of the S.W. Wall started in October 1986 and finished in November 1987. The construction of the S.E. Wall started in August, 1987, and finished in December 1987. Settlement and movement of the walls are monitored by surveying bench marks embedded in the walls caps. Settlement up to 0.65 inches was measured in the N.E. Wall with a maximum lateral movement of 1.1 inches after three months of construction. Hairline cracks and air pockets are visible in the finished sections of the concreted panels for these walls.
Hilfiker Retaining Walls with Full Height Cast-in-Place Panels
Construction of retaining walls utilizing full height panels introduces a degree of indeterminacy to the structure. The ability to effectively analyze the internal behavior of such systems, and limited field performance, qualifies them as appropriate to the experimental category. Arizona recently utilized the technique for building three permanent earth retaining structures at the interchange of I-10 and 24th Street in Phoenix, Arizona. The construction technique chosen was the Hilfiker Reinforced Soil Embankment with cast-in-place concrete facing. The construction of the N.E. Wall started in September 1986 and finished in January 1987, while the construction of the S.W. Wall started in October 1986 and finished in November 1987. The construction of the S.E. Wall started in August, 1987, and finished in December 1987. Settlement and movement of the walls are monitored by surveying bench marks embedded in the walls caps. Settlement up to 0.65 inches was measured in the N.E. Wall with a maximum lateral movement of 1.1 inches after three months of construction. Hairline cracks and air pockets are visible in the finished sections of the concreted panels for these walls.
Hilfiker Retaining Walls with Full Height Cast-in-Place Panels
A. H. Osseiran (Autor:in)
1988
150 pages
Report
Keine Angabe
Englisch
Highway Engineering , Construction Equipment, Materials, & Supplies , Retaining walls , Precast concrete , Panels , Backfills , Concrete construction , Embankments , Soil stabilization , Concrete structures , Arizona , Settlement(Structural) , Reinforcement(Structures) , Cracking(Fracturing) , Highway construction , Specifications , Hilfiker retaining walls
MSE Walls with independent Full-Height Facing Panels
ASCE | 2005
|Retaining walls of modernate height
Engineering Index Backfile | 1933
|Experimental investigation of two-row retaining walls constructed from cast-in-place piles
Online Contents | 1983
|Retaining Walls and Embankments - Holding walls in place on a Scottish gorge
Online Contents | 2008
Stresses in Full Height Fascia Panels
NTIS | 1985
|