Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Memoranda for the file, P Department: Part 1, Book 10, 1944--1946
The P Department has direct responsibility for the receipt of raw uranium metal, and for its processing in the 300 and 100 Areas to the point of final delivery to the Metal Storage Basins in the 200-N Area. This involves overall responsibility for all production facilities in these four Areas, including operation of the Metal Storage Buildings (303, 103), the Test Pile (Bldg. 305) and the Retention Basins (107). During plant erection, the Department provided the Construction Division with consultant and checking services.
Memoranda for the file, P Department: Part 1, Book 10, 1944--1946
The P Department has direct responsibility for the receipt of raw uranium metal, and for its processing in the 300 and 100 Areas to the point of final delivery to the Metal Storage Basins in the 200-N Area. This involves overall responsibility for all production facilities in these four Areas, including operation of the Metal Storage Buildings (303, 103), the Test Pile (Bldg. 305) and the Retention Basins (107). During plant erection, the Department provided the Construction Division with consultant and checking services.
Memoranda for the file, P Department: Part 1, Book 10, 1944--1946
1946
166 pages
Report
Keine Angabe
Englisch
Memoranda for the File: P Department, Part 2
NTIS | 1946
Royal Society of Chemistry | 1853
|Wiley | 1918
|Electrical Tables and memoranda