Hanford Engineer Works monthly report, October 1946. Deletion
This report covers the calendar month of October 1946, for Hanford Engineer Works. The power levels of the Piles at 100 D and 100 F were maintained at 250 megawatts (MW) and 200 MW respectively. The operating time efficiency was 84.6. Thirty-nine batches were started through the Canyon Building and forty-three charges were delivered from the Isolation Building. There was one major injury in October. As of October 31, the plant had accumulated sixteen injury free days. A Design and Construction Department has initiated operation from its new location in W-4 Dormitory.
Hanford Engineer Works monthly report, October 1946. Deletion
This report covers the calendar month of October 1946, for Hanford Engineer Works. The power levels of the Piles at 100 D and 100 F were maintained at 250 megawatts (MW) and 200 MW respectively. The operating time efficiency was 84.6. Thirty-nine batches were started through the Canyon Building and forty-three charges were delivered from the Isolation Building. There was one major injury in October. As of October 31, the plant had accumulated sixteen injury free days. A Design and Construction Department has initiated operation from its new location in W-4 Dormitory.
Hanford Engineer Works monthly report, October 1946. Deletion
1946
167 pages
Report
Keine Angabe
Englisch
Hanford Works monthly report, March 1948
NTIS | 1948
Hanford Works monthly report, February 1948
NTIS | 1948