Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
This document reports finding of an investigation into the use of statistical methods for geotechnical engineering aspects of new dam projects. The intent was to identify specific statistical methodology which could be beneficially adopted by the Corps of Engineers on future projects. As a vehicle for investigating statistical methods, the study used an existing US Army Corps of Engineers project as a test case. Data from that project provided the substantive material upon which statistical methodology was exercised.
This document reports finding of an investigation into the use of statistical methods for geotechnical engineering aspects of new dam projects. The intent was to identify specific statistical methodology which could be beneficially adopted by the Corps of Engineers on future projects. As a vehicle for investigating statistical methods, the study used an existing US Army Corps of Engineers project as a test case. Data from that project provided the substantive material upon which statistical methodology was exercised.
Uncertainty Analysis for DAM Projects
G. Baecher (Autor:in)
1987
209 pages
Report
Keine Angabe
Englisch
Uncertainty Analysis of Coastal Projects
British Library Conference Proceedings | 1999
|Stakeholders and uncertainty management in projects
British Library Online Contents | 2008
|Uncertainty and Risk in Construction Projects
British Library Conference Proceedings | 1996
|Stakeholders and uncertainty management in projects
Online Contents | 2008
|