Tests were performed on the left spillway tunnel of Glen Canyon Dam August 11 through 17, 1984. The tests were used to evaluate: the effectiveness of the air slot; the adequacy of the tunnel lining repair specification; and the model to prototype conformance. The evaluations were made through a series of measurements and observations. Results showed the newly installed air slot to be operating satisfactorily. Evidence of cavitation damage was not observed.
Tests were performed on the left spillway tunnel of Glen Canyon Dam August 11 through 17, 1984. The tests were used to evaluate: the effectiveness of the air slot; the adequacy of the tunnel lining repair specification; and the model to prototype conformance. The evaluations were made through a series of measurements and observations. Results showed the newly installed air slot to be operating satisfactorily. Evidence of cavitation damage was not observed.
Spillway Tests at Glen Canyon Dam
K. W. Frizell (Autor:in)
1985
60 pages
Report
Keine Angabe
Englisch
NTIS | 2006
|Engineering Index Backfile | 1961
|Engineering Index Backfile | 1957
Engineering Index Backfile | 1961