Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Thin Overlay. Custer Way Undercrossing 5/316
A polymer concrete thin overlay, EPI/FLEX III (epoxy) was applied to the deck of the Custer Way Undercrossing, Bridge No. 5/316, under Contract No. 3361, SR 5 Trosper Road Interchange to Capital Lake Interchange. The bridge crosses mainline I-5 in Tumwater, Washington. The report describes the construction and provides data on the post-construction evaluation of the completed overlay.
Thin Overlay. Custer Way Undercrossing 5/316
A polymer concrete thin overlay, EPI/FLEX III (epoxy) was applied to the deck of the Custer Way Undercrossing, Bridge No. 5/316, under Contract No. 3361, SR 5 Trosper Road Interchange to Capital Lake Interchange. The bridge crosses mainline I-5 in Tumwater, Washington. The report describes the construction and provides data on the post-construction evaluation of the completed overlay.
Thin Overlay. Custer Way Undercrossing 5/316
T. H. Roper (Autor:in) / E. H. Henley (Autor:in)
1991
32 pages
Report
Keine Angabe
Englisch
Highway Engineering , Construction Equipment, Materials, & Supplies , Transportation & Traffic Planning , Transportation , Road Transportation , Pavement overlays , Bridge decks , Concrete payments , Concretes , Highway maintenance , Highway bridges , Washington(State) , Concrete construction , Road materials , Aggregates , Latex
A Conventionally Tunneled River Undercrossing
British Library Conference Proceedings | 2010
|Monitoring method for undercrossing sensitive building
Europäisches Patentamt | 2024
|Tunnelling undercrossing existing live MRT tunnels
British Library Online Contents | 2016
|A River Undercrossing at Peterborough
Wiley | 1950
|