Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Route 3, Randolph County, Missouri. 4.4 Miles South of Macon County to U.S. 24
The action proposes the acquisition of right-of-way, grading, surfacing with intermediate type pavement, a railroad - highway grade separation structure, and the construction of road drainage facilities which include new bridges over Muncas Creek and Middle Fork of Chariton River. The improvement provides a safe and modern highway facility. A few persons and businesses will be displaced. Wildlife habitat will be lost, and land must be acquired for right-of-way.
Route 3, Randolph County, Missouri. 4.4 Miles South of Macon County to U.S. 24
The action proposes the acquisition of right-of-way, grading, surfacing with intermediate type pavement, a railroad - highway grade separation structure, and the construction of road drainage facilities which include new bridges over Muncas Creek and Middle Fork of Chariton River. The improvement provides a safe and modern highway facility. A few persons and businesses will be displaced. Wildlife habitat will be lost, and land must be acquired for right-of-way.
Route 3, Randolph County, Missouri. 4.4 Miles South of Macon County to U.S. 24
1973
41 pages
Report
Keine Angabe
Englisch
Environmental Pollution & Control , Environmental surveys , Roads , Missouri , Access roads , Traffic engineering , Traffic safety , Right of way acquisition , Channels(Waterways) , Bridges(Structures) , Eminent domain , Environmental impact statements , Randolph County(Missouri) , Missouri route 3 , Collector roads