Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Conceptual Plan for 105-N Basin high-exposure rate hardware
This conceptual plan describes the selected approach for handling and packaging hardware waste with contact exposure rates greater than 1 R/hr. This plan is intended to guide the performance of detailed planning, and the development of work packages and procedures for this activity. This plan discusses: the grouting process for high-exposure rate hardware shall be performed underwater; removal of fuel fragments from the N Basin; and the grouting of irradiated hardware before removal from the 105-N Basin.
Conceptual Plan for 105-N Basin high-exposure rate hardware
This conceptual plan describes the selected approach for handling and packaging hardware waste with contact exposure rates greater than 1 R/hr. This plan is intended to guide the performance of detailed planning, and the development of work packages and procedures for this activity. This plan discusses: the grouting process for high-exposure rate hardware shall be performed underwater; removal of fuel fragments from the N Basin; and the grouting of irradiated hardware before removal from the 105-N Basin.
Conceptual Plan for 105-N Basin high-exposure rate hardware
D. J. Pisarcik (Autor:in)
1995
21 pages
Report
Keine Angabe
Englisch
British Library Conference Proceedings | 2000
|Conceptual Land Use Plan - Technical Supplement
NTIS | 1971
Comprehensive plan for Columbia basin
Engineering Index Backfile | 1950
|Ravi River Basin Developmental Plan
British Library Online Contents | 1994
|