Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Innovative Bridge Design/Construction Techniques to Expedite Construction
This project examined various methods of innovative bridge design and construction techniques to expedite construction. The following methods have been identified as possible methods of reducing the time needed for bridge construction: (a) Precast substructures; (b) Prefabricated composite bridge units; (c) Prefabricated superstructure units, such as adjacent boxes, which do not need a separate wearing surface; (d) Full depth precast concrete decks; (e) Stay-in-place concrete or steel forms; (f) Completely prefabricated bridges; (g) Rapid curing concrete materials. Items 1-6 have been tried in various states and the results of these trials can be found in an AASHTO Technology Implementation Group (TIG) report at www.ashtotig.org. (2) In order to find additional information on barriers to rapid construction, a survey of contractors was conducted. This survey showed that the main obstacle to fast bridge construction is the forming of the deck. The contractors also indicated that the best way to build bridges faster was to allow the entire bridge to be closed and the reconstruction to occur all at one time.
Innovative Bridge Design/Construction Techniques to Expedite Construction
This project examined various methods of innovative bridge design and construction techniques to expedite construction. The following methods have been identified as possible methods of reducing the time needed for bridge construction: (a) Precast substructures; (b) Prefabricated composite bridge units; (c) Prefabricated superstructure units, such as adjacent boxes, which do not need a separate wearing surface; (d) Full depth precast concrete decks; (e) Stay-in-place concrete or steel forms; (f) Completely prefabricated bridges; (g) Rapid curing concrete materials. Items 1-6 have been tried in various states and the results of these trials can be found in an AASHTO Technology Implementation Group (TIG) report at www.ashtotig.org. (2) In order to find additional information on barriers to rapid construction, a survey of contractors was conducted. This survey showed that the main obstacle to fast bridge construction is the forming of the deck. The contractors also indicated that the best way to build bridges faster was to allow the entire bridge to be closed and the reconstruction to occur all at one time.
Innovative Bridge Design/Construction Techniques to Expedite Construction
R. A. Miller (Autor:in)
2005
60 pages
Report
Keine Angabe
Englisch
Bar joist floors expedite construction
Engineering Index Backfile | 1929
Bar joist floors expedite construction
Engineering Index Backfile | 1929
Use of Precast Concrete to Expedite Industrial Construction
British Library Conference Proceedings | 2008
|Innovative Design and Aesthetics in Bridge Construction
Online Contents | 2003
|