Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
City of North Adams Haskins (School) Solar Wall. Final Project Report
The project consists of retrofitting a two section, air cooled, horizontal flow-passive solar collector to a school building. The collector is briefly described and the system performance reveals a savings of 650 to 1000 gallons of oil per year. (ERA citation 11:000381)
City of North Adams Haskins (School) Solar Wall. Final Project Report
The project consists of retrofitting a two section, air cooled, horizontal flow-passive solar collector to a school building. The collector is briefly described and the system performance reveals a savings of 650 to 1000 gallons of oil per year. (ERA citation 11:000381)
City of North Adams Haskins (School) Solar Wall. Final Project Report
1982
10 pages
Report
Keine Angabe
Englisch
WORKING DETAILS - Mill conversion, Gareth Haskins Architects
Online Contents | 2000
William Haskins. February 13, 1839. Laid on the table
TIBKAT | 1839
|