Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Test plan for electrostatic curtain studies
This test plan describes experimental details of engineering-scale electrostatic curtain research experiments to be performed at the Idaho National Engineering Laboratory in FY-91. These experiments will investigate the feasibility of using electrostatic curtains as devices to control the spread of contaminants during transuranic waste handling operations. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the FY-91 experiments are included in this plan. 11 refs.
Test plan for electrostatic curtain studies
This test plan describes experimental details of engineering-scale electrostatic curtain research experiments to be performed at the Idaho National Engineering Laboratory in FY-91. These experiments will investigate the feasibility of using electrostatic curtains as devices to control the spread of contaminants during transuranic waste handling operations. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the FY-91 experiments are included in this plan. 11 refs.
Test plan for electrostatic curtain studies
L. C. Meyer (Autor:in) / G. G. Loomis (Autor:in)
1991
58 pages
Report
Keine Angabe
Englisch
Dress Rehearsal: Raising the Curtain on Your Emergency Response Plan
British Library Conference Proceedings | 1999
|Curtain control method and device, curtain controller and curtain
Europäisches Patentamt | 2020
|