Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Improved Coal-Interface Detector. Final Technical Report, December 1981
In many underground coal mines a specified thickness of coal is required to be left in the roof as the coal is mined to maintain roof stability and prevent exposure of the overburden to air that might cause it to deteriorate. Determining the thickness of the coal left in the roof during mining is important for safety reasons and to maximize profit to the mine operators. The system (FM/CW radar) described in this report calculates the coal thickness from the time delay measurements of electromagnetic waves reflected from the bottom and top surfaces of the roof coal. This report describes the theory, design, construction and testing of an electromagnetic coal interface detector. An above ground test facility constructed to evaluate the coal interface detector is also described. (ERA citation 07:052613)
Improved Coal-Interface Detector. Final Technical Report, December 1981
In many underground coal mines a specified thickness of coal is required to be left in the roof as the coal is mined to maintain roof stability and prevent exposure of the overburden to air that might cause it to deteriorate. Determining the thickness of the coal left in the roof during mining is important for safety reasons and to maximize profit to the mine operators. The system (FM/CW radar) described in this report calculates the coal thickness from the time delay measurements of electromagnetic waves reflected from the bottom and top surfaces of the roof coal. This report describes the theory, design, construction and testing of an electromagnetic coal interface detector. An above ground test facility constructed to evaluate the coal interface detector is also described. (ERA citation 07:052613)
Improved Coal-Interface Detector. Final Technical Report, December 1981
K. C. Roe (Autor:in) / R. C. Wittmann (Autor:in)
1981
50 pages
Report
Keine Angabe
Englisch
Improved Coal Interface Detector
NTIS | 1982
|Linear Corrugating: Final Technical Report
NTIS | 2000
|AUSTRALIAN PLANNER DECEMBER 1981
Taylor & Francis Verlag | 2012
|