Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Key Royale Bridge Five Year Evaluation, Summary Report
The report describes the design, construction, instrumentation, and five-year evaluation of the Key Royale Bridge substructure. The primary focus was the evaluation of the implementation of highly reactive supplementary cementitious materials (SCM) into the construction of the bridge piles.
Key Royale Bridge Five Year Evaluation, Summary Report
The report describes the design, construction, instrumentation, and five-year evaluation of the Key Royale Bridge substructure. The primary focus was the evaluation of the implementation of highly reactive supplementary cementitious materials (SCM) into the construction of the bridge piles.
Key Royale Bridge Five Year Evaluation, Summary Report
H. R. Hamilton (Autor:in)
2013
1 pages
Report
Keine Angabe
Englisch
Key Royale Bridge Five Year Evaluation
NTIS | 2013
|Model Bridge Study. Volume 1. Summary Report
NTIS | 1992
|Five-year Research Summary Using PAM in Furrow Irrigation
British Library Conference Proceedings | 1996
|Project Summary Report: Truss Bridge Retrofit Railings
NTIS | 2004
|