Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunnel Cost Estimating Under Conditions of Uncertainty
Of all areas of heavy construction, tunnel projects are subject to perhaps the greatest degree of uncertainty from the standpoint of predicting cost and progress. Sources of uncertainty include the unknown nature of geologic conditions along the tunnel alignment, and the difficulty of estimating the performance of men and equipment within the narrow confines of the tunnel. In this report a method is presented for explicitly reflecting these uncertainties in estimates of the time and cost of tunnel construction.
Tunnel Cost Estimating Under Conditions of Uncertainty
Of all areas of heavy construction, tunnel projects are subject to perhaps the greatest degree of uncertainty from the standpoint of predicting cost and progress. Sources of uncertainty include the unknown nature of geologic conditions along the tunnel alignment, and the difficulty of estimating the performance of men and equipment within the narrow confines of the tunnel. In this report a method is presented for explicitly reflecting these uncertainties in estimates of the time and cost of tunnel construction.
Tunnel Cost Estimating Under Conditions of Uncertainty
R. D. Wyatt (Autor:in)
1974
211 pages
Report
Keine Angabe
Englisch
Tunnel Cost-Estimating Methods
NTIS | 1981
|Tunnel Cost Estimating—Sharing our Experience
TIBKAT | 2020
|Framework for Detailed Probabilistic Tunnel Cost Estimating
British Library Conference Proceedings | 2003
|A life cycle model for estimating road tunnel cost
Elsevier | 2021
|