Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
INTERNATIONAL CONSTRUCTION REPORT - J-Lay addition, DP upgrade equips SSCV for ultra deepwater pipelay - A Staff Report - Addition of a 430-ft tower is one of several improvements that is enabling Saipem 7000 to install pipe lines in waters down to 6,600 ft and below
INTERNATIONAL CONSTRUCTION REPORT - J-Lay addition, DP upgrade equips SSCV for ultra deepwater pipelay - A Staff Report - Addition of a 430-ft tower is one of several improvements that is enabling Saipem 7000 to install pipe lines in waters down to 6,600 ft and below
INTERNATIONAL CONSTRUCTION REPORT - J-Lay addition, DP upgrade equips SSCV for ultra deepwater pipelay - A Staff Report - Addition of a 430-ft tower is one of several improvements that is enabling Saipem 7000 to install pipe lines in waters down to 6,600 ft and below
Pipe-line & gas industry ; 83 ; 63-66
2000
Aufsatz (Zeitschrift)
Englisch
Online Contents | 1999
New pipelay vessel headed for construction work this summer - A Staff Report
Online Contents | 1995