Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Time-based two dimensional modelling of NATM tunnelling
Time-based two dimensional modelling of NATM tunnelling
Time-based two dimensional modelling of NATM tunnelling
Shin, J.H. (Autor:in) / Potts, D.M.
2002
Aufsatz (Zeitschrift)
Unbekannt
Time-based two dimensional modelling of NATM tunnelling
British Library Online Contents | 2002
|Bored tunnelling - NATM tunnelling
British Library Conference Proceedings | 2000
|Three-dimensional modelling of NATM tunnelling in decomposed granite soil
Online Contents | 2002
|Three-dimensional modelling of NATM tunnelling in decomposed granite soil
British Library Online Contents | 2002
|Three-dimensional modelling of NATM tunnelling in decomposed granite soil
British Library Online Contents | 2003
|