Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SPECIAL REPORT - Pelton-Round Butte Hydra Project - The Round Butte Upgrade: Completing Two Units in One Season - Accomplished during one season in 2002 on the tight schedule demanded in a 'fast track' approach, Portland General Electric and the Confederated Tribes of the Warm Springs Reservation minimized outage time while significantly upgrading efficiency and capacity in two of three units at the 352-MW Round Butte plant.
SPECIAL REPORT - Pelton-Round Butte Hydra Project - The Round Butte Upgrade: Completing Two Units in One Season - Accomplished during one season in 2002 on the tight schedule demanded in a 'fast track' approach, Portland General Electric and the Confederated Tribes of the Warm Springs Reservation minimized outage time while significantly upgrading efficiency and capacity in two of three units at the 352-MW Round Butte plant.
SPECIAL REPORT - Pelton-Round Butte Hydra Project - The Round Butte Upgrade: Completing Two Units in One Season - Accomplished during one season in 2002 on the tight schedule demanded in a 'fast track' approach, Portland General Electric and the Confederated Tribes of the Warm Springs Reservation minimized outage time while significantly upgrading efficiency and capacity in two of three units at the 352-MW Round Butte plant.
Hackett, Gary W. (Autor:in) / Hemelstrand, Michael D.
Hydro review ; 22
2003
Aufsatz (Zeitschrift)
Englisch
British Library Online Contents | 2003
|Pelton Round Butte Relicensing: Lessons Learned from a Negotiated Settlement
British Library Online Contents | 2006
|Pelton-Round Butte: Enhancing Fish Passage, Wildlife, and Recreational Opportunities
British Library Online Contents | 2004
|Relicensing Pelton-Round Butte: Protecting both Power and the Environment
British Library Online Contents | 2003
|