Using Robot Welders to Fix Tunnel Leak at Sainte-Marguerite-3 - A shifting foundation caused a leak in the headrace tunnel during construction of the 882-MW Sainte-Marguerite-3 project. To bring the project back on track, owner Hydro-Québec used robot welders.
Using Robot Welders to Fix Tunnel Leak at Sainte-Marguerite-3 - A shifting foundation caused a leak in the headrace tunnel during construction of the 882-MW Sainte-Marguerite-3 project. To bring the project back on track, owner Hydro-Québec used robot welders.
Using Robot Welders to Fix Tunnel Leak at Sainte-Marguerite-3 - A shifting foundation caused a leak in the headrace tunnel during construction of the 882-MW Sainte-Marguerite-3 project. To bring the project back on track, owner Hydro-Québec used robot welders.
Busque, Laurent W. (Autor:in)
Hydro review ; 24
2005
Aufsatz (Zeitschrift)
Englisch
Using Robot Welders to Fix Tunnel Leak at Sainte-Marguerite-3
British Library Online Contents | 2005
|British Library Online Contents | 1999
|Construction of the Sainte-Marguerite SM3 dam in Quebec
Online Contents | 1999
|Construction du barrage Sainte-Marguerite-3
British Library Conference Proceedings | 2000
|