Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prototype Integrated Cost and Schedule Control System.
Prototype Integrated Cost and Schedule Control System.
Prototype Integrated Cost and Schedule Control System.
Abudayyeh, Osama Y. (Autor:in) / Rasdorf, William J.
1993
Aufsatz (Zeitschrift)
Unbekannt
BKL:
56.03
/
56.03
Methoden im Bauingenieurwesen
Lokalklassifikation TIB:
770/3130/6500
Prototype Integrated Cost and Schedule Control System
British Library Online Contents | 1993
|Project Numbering System for Integrated Cost and Schedule Control
British Library Conference Proceedings | 2001
|Integrated cost and schedule control for construction projects
TIBKAT | 1986
|Flexible Work Breakdown Structure for Integrated Cost and Schedule Control
Online Contents | 2004
|Flexible Work Breakdown Structure for Integrated Cost and Schedule Control
British Library Online Contents | 2004
|