Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CFRD - Drilling at new heights - Heavy-duty drill rigs have been used during the construction of Bakun dam
CFRD - Drilling at new heights - Heavy-duty drill rigs have been used during the construction of Bakun dam
CFRD - Drilling at new heights - Heavy-duty drill rigs have been used during the construction of Bakun dam
2006
Aufsatz (Zeitschrift)
Englisch
Design criteria for the Bakun CFRD
Online Contents | 1996
|Construction of the Bakun dam: The world's second highest CFRD
Online Contents | 2009
|Drill rigs - Drill rigs as an excavation choice
Online Contents | 2014
|Online Contents | 1995
Venezuela's experience with CFRD construction
Online Contents | 2008
|