Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Chloride-Induced Corrosion in Insufficiently Grouted Posttensioned Concrete Beams
Chloride-Induced Corrosion in Insufficiently Grouted Posttensioned Concrete Beams
Chloride-Induced Corrosion in Insufficiently Grouted Posttensioned Concrete Beams
Minh, Ha (Autor:in) / Mutsuyoshi, Hiroshi / Taniguchi, Hirotsugu / Niitani, Kyoji
2008
Aufsatz (Zeitschrift)
Unbekannt
BKL:
56.45
Baustoffkunde
Lokalklassifikation TIB:
535/6520/6525/xxxx
Chloride-Induced Corrosion in Insufficiently Grouted Posttensioned Concrete Beams
British Library Online Contents | 2008
|Chloride-Induced Corrosion in Insufficiently Grouted Posttensioned Concrete Beams
British Library Conference Proceedings | 2007
|Shear Capacity of CFRP Posttensioned Grouted Transverse Joints under Concentrated Loads
Online Contents | 2016
|Shear Capacity of CFRP Posttensioned Grouted Transverse Joints under Concentrated Loads
British Library Online Contents | 2016
|