Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ENGINEERING, CONSTRUCTION, & INSTALLATION - Installation of the world's deepest spar - Shell's Perdido development is a record-setting venture. The list of world firsts includes an integrated topsides installation that set a new record for lift weight in the US Gulf of Mexico (GoM) at 8,866 metric tons (9,773 tons).
ENGINEERING, CONSTRUCTION, & INSTALLATION - Installation of the world's deepest spar - Shell's Perdido development is a record-setting venture. The list of world firsts includes an integrated topsides installation that set a new record for lift weight in the US Gulf of Mexico (GoM) at 8,866 metric tons (9,773 tons).
ENGINEERING, CONSTRUCTION, & INSTALLATION - Installation of the world's deepest spar - Shell's Perdido development is a record-setting venture. The list of world firsts includes an integrated topsides installation that set a new record for lift weight in the US Gulf of Mexico (GoM) at 8,866 metric tons (9,773 tons).
Offshore ; 70
2010
Aufsatz (Zeitschrift)
Englisch
Thatcher installation moves raw materials instead of dead tons
Tema Archiv | 1973
Engineering Index Backfile | 1956