Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Skarv FPSO turret mooring system: A 5,000-ton challenge BP intends to develop the Skarv field using a turret moored new-build FPSO.
The Skarv FPSO turret mooring system: A 5,000-ton challenge BP intends to develop the Skarv field using a turret moored new-build FPSO.
The Skarv FPSO turret mooring system: A 5,000-ton challenge BP intends to develop the Skarv field using a turret moored new-build FPSO.
Offshore ; 71
2011
Aufsatz (Zeitschrift)
Englisch
Experimental and Numerical Study of the Motions of a Turret Moored FPSO in Waves
Online Contents | 2005
|Dynamic Asynchronous Coupled Analysis and Experimental Study for a Turret Moored FPSO in Random Seas
Online Contents | 2015
|The Feasibility of a Central Turret in FPSO Systems
Online Contents | 1999
|Online Contents | 1993