Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
An approach to shorten the construction period of high embankment on soft soil improved with PVD
An approach to shorten the construction period of high embankment on soft soil improved with PVD
An approach to shorten the construction period of high embankment on soft soil improved with PVD
Sinha, A.K. (Autor:in) / Havanagi, V.G. / Mathur, S.
2009
Aufsatz (Zeitschrift)
Englisch
An approach to shorten the construction period of high embankment on soft soil improved with PVD
Online Contents | 2009
|VE to Shorten Construction Period
TIBKAT | 2015
|Steel structure construction method that can shorten the construction period
Europäisches Patentamt | 2023
|