Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Optimization of process integration and multi-skilled resource utilization in off-site construction
Optimization of process integration and multi-skilled resource utilization in off-site construction
Optimization of process integration and multi-skilled resource utilization in off-site construction
Arashpour, Mehrdad (Autor:in) / Wakefield, Ron / Blismas, Nick / Minas, James
2015
Aufsatz (Zeitschrift)
Englisch
BKL:
56.03
Methoden im Bauingenieurwesen
Optimization of process integration and multi-skilled resource utilization in off-site construction
British Library Online Contents | 2015
|Augmented heuristic algorithm for multi-skilled resource scheduling
Online Contents | 2011
|