Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Boss resources will acquire honeymoon uranium project
Facilities at the Honeymoon project include an 880,000-lb/y solvent extraction plant; well fields currently on care and maintenance; a 200-person accommodations camp: administration buildings; a 75-km power line connecting to mains power; a fleet of vehicles, spares, and other equipment associated with the commissioning of the project; a runway capable of landing light planes; an extensive geological database of 17,000 drill holes and associated logging information; and cash-backed environmental bonds in the amount of A$8.7 million.
Boss resources will acquire honeymoon uranium project
Facilities at the Honeymoon project include an 880,000-lb/y solvent extraction plant; well fields currently on care and maintenance; a 200-person accommodations camp: administration buildings; a 75-km power line connecting to mains power; a fleet of vehicles, spares, and other equipment associated with the commissioning of the project; a runway capable of landing light planes; an extensive geological database of 17,000 drill holes and associated logging information; and cash-backed environmental bonds in the amount of A$8.7 million.
Boss resources will acquire honeymoon uranium project
2015
Aufsatz (Zeitschrift)
Englisch
PERSPECTIVE - A Honeymoon Delayed
Online Contents | 1998
|UNTERWEGS - Honeymoon auf Usedom
Online Contents | 2009
Architecture and psychology : beyond the honeymoon
TIBKAT | 1967
|Performance of MUF honeymoon adhesive for glulam
Tema Archiv | 2014
|Seabridge to Acquire Snowstorm Project
Online Contents | 2017