Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Northam Platinum acquiring Aquarius' Everest mine
The mine and its associated assets are located adjacent to Northam's Booysendal resource and include a concentrator with throughput capacity of 250,000 mt/m; a chrome spiral recovery plant; a tailings dam; and three decline shaft systems.
Northam Platinum acquiring Aquarius' Everest mine
The mine and its associated assets are located adjacent to Northam's Booysendal resource and include a concentrator with throughput capacity of 250,000 mt/m; a chrome spiral recovery plant; a tailings dam; and three decline shaft systems.
Northam Platinum acquiring Aquarius' Everest mine
2015
Aufsatz (Zeitschrift)
Englisch
Africa: Aquarius Platinum Resumes Production at Everest
Online Contents | 2010
AROUND THE WORLD - Africa: Aquarius Ships First Everest PGM Concentrate
Online Contents | 2006
New Northam bridge, Southampton
Engineering Index Backfile | 1955
|Northam Railway Bridge: an unusual bridge in Southampton
British Library Online Contents | 1998
|