Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bear Creek advancing Corani Ag-Pb-Zn project in Peru
of the modifications to the Corani mine design in the updated 2015 Corani feasibility study, we have created a more compact, efficient, and cost-effective operation, with a smaller physical and environmental footprint, which we expect will result in a shorter and less costly path to permitting.
Bear Creek advancing Corani Ag-Pb-Zn project in Peru
of the modifications to the Corani mine design in the updated 2015 Corani feasibility study, we have created a more compact, efficient, and cost-effective operation, with a smaller physical and environmental footprint, which we expect will result in a shorter and less costly path to permitting.
Bear Creek advancing Corani Ag-Pb-Zn project in Peru
2015
Aufsatz (Zeitschrift)
Englisch
BASE | 2001
|Online Contents | 2015
Engineering Index Backfile | 1928
|Bear Creek Watershed assessment: Phase II - Bear Creek tributary assessment (Summary and Part I)
BASE | 2001
|Safety Modifications for Bear Creek Dam
British Library Conference Proceedings | 1991
|