Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rio Tinto earning into Reservoir's Serbian copper-gold project
If Rio Tinto incurs further project expenditures of $58 million in connection with the preparation of a pre-feasibility study by the later of the fourth anniversary of the stage 2 vesting date or November 30, 2025, it will earn an additional 10% interest in the Tilva project, resulting in its total interest being 75%.
Rio Tinto earning into Reservoir's Serbian copper-gold project
If Rio Tinto incurs further project expenditures of $58 million in connection with the preparation of a pre-feasibility study by the later of the fourth anniversary of the stage 2 vesting date or November 30, 2025, it will earn an additional 10% interest in the Tilva project, resulting in its total interest being 75%.
Rio Tinto earning into Reservoir's Serbian copper-gold project
2015
Aufsatz (Zeitschrift)
Englisch
Lundin Acquiring Interest in Serbian Copper-Gold Project
Online Contents | 2016
OZ Minerals earning into West Musgrave Copper-Nickel Project
Online Contents | 2016
ALLEGHENY RESERVOIR'S ROLE IN WATER QUALITY
Wiley | 1969
|Derivation of Reservoir's Area-Capacity Equations
Online Contents | 2009
|Derivation of Reservoir's Area-Capacity Equations
British Library Online Contents | 2009
|