Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Detour Gold drilling at lower detour continues to produce positive results
Detour Gold is continuing its Lower Detour drilling campaign this winter with an infill and step-out drilling program of up to 75,000 m. Detour Gold COO Pierre Beaudoin said, "The upcoming drilling program will provide the answers we need before we make the decision to start an underground exploration program at Zone 58N."
Detour Gold drilling at lower detour continues to produce positive results
Detour Gold is continuing its Lower Detour drilling campaign this winter with an infill and step-out drilling program of up to 75,000 m. Detour Gold COO Pierre Beaudoin said, "The upcoming drilling program will provide the answers we need before we make the decision to start an underground exploration program at Zone 58N."
Detour Gold drilling at lower detour continues to produce positive results
2016
Aufsatz (Zeitschrift)
Englisch
Online Contents | 2016
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|Online Contents | 2012
AROUND THE WORLD - U.S. & Canada: Detour Gold Updates Detour Lake Life-of-Mine Plan
Online Contents | 2014