Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Asanko Planning Major Expansions at Ghana Gold Operations
Asanko Gold Inc. has announced the results of a definitive feasibility study of a staged expansion of its Asanko gold operations in southwest Ghana from current plant throughput of 3 million metric tons per year (mt/y), first to 5 million mt/y and then to 10 million mt/y. Plant feed for current operations derives from the Nkran open pit and satellite pits in close proximity to the plant. A new mining operation will be developed on the large-scale Esaase deposit 27 kilometers (km) from the plant to provide the majority of future plant feed, and a conveyor belt will be built to carry crushed ore from Esaase to the expanded plant
Asanko Planning Major Expansions at Ghana Gold Operations
Asanko Gold Inc. has announced the results of a definitive feasibility study of a staged expansion of its Asanko gold operations in southwest Ghana from current plant throughput of 3 million metric tons per year (mt/y), first to 5 million mt/y and then to 10 million mt/y. Plant feed for current operations derives from the Nkran open pit and satellite pits in close proximity to the plant. A new mining operation will be developed on the large-scale Esaase deposit 27 kilometers (km) from the plant to provide the majority of future plant feed, and a conveyor belt will be built to carry crushed ore from Esaase to the expanded plant
Asanko Planning Major Expansions at Ghana Gold Operations
2017
Aufsatz (Zeitschrift)
Englisch
Asanko planning major expansions at Gnana gold operations
Online Contents | 2017
Asanko commissioning Ghana gold mine
Online Contents | 2016
Decentralizing regional planning in Ghana
TIBKAT | 1985
|Endeavour Mining Acquires Mali Gold Project, Sells Ghana Gold Mine
Online Contents | 2017
Neoliberalism and decentralised development planning in Ghana
Online Contents | 1996
|