Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cadia East PC1 Production Begins Again
The remediation and upgrade work required to recommence use of Cadia East's Panel Cave 1 (PC1) crusher chamber has been completed to a standard consistent with Newcrest's emphasis on safe, strong and sustainable operations. Extraction of ore has now recommenced from two extraction drives in PC1, the company said. On April 14, a large seismic event occurred near Newcrest's Cadia East mine, an underground panel-cave operation located 25 kilometers (km) south of Orange, New South Wales, Australia. Newcrest submitted final ground support plans for the PC1 crusher chamber and extraction level, which were accepted by regulators, who amended a Prohibition Notice, allowing operations to recommence as areas are upgraded.
Cadia East PC1 Production Begins Again
The remediation and upgrade work required to recommence use of Cadia East's Panel Cave 1 (PC1) crusher chamber has been completed to a standard consistent with Newcrest's emphasis on safe, strong and sustainable operations. Extraction of ore has now recommenced from two extraction drives in PC1, the company said. On April 14, a large seismic event occurred near Newcrest's Cadia East mine, an underground panel-cave operation located 25 kilometers (km) south of Orange, New South Wales, Australia. Newcrest submitted final ground support plans for the PC1 crusher chamber and extraction level, which were accepted by regulators, who amended a Prohibition Notice, allowing operations to recommence as areas are upgraded.
Cadia East PC1 Production Begins Again
2017
Aufsatz (Zeitschrift)
Englisch
Newcrest readies Cadia project
Online Contents | 1998
Inverse Analysis of Cadia Tailings Dam Failure
British Library Conference Proceedings | 2023
|Inverse Analysis of Cadia Tailings Dam Failure
ASCE | 2023
|Online Contents | 2017