Gate road layout design for two-seam longwall mining
Summary Results of instrumentation, test mining and computer aided stability analyses were combined to design the most stable gate road layout for two-seam longwall mining at the Plateau Mining Company. Five layouts were evaluated; these layouts used a combination of yield and/or large pillars with either three-entry or two-entry development systems. A layout which used a yield pillar within a two-entry development system resulted in the most stable gate roads for two-seam mining. Another layout using a yield and large pillar was shown to be most stable for single-seam mining of the top seam, but it was unsuitable for two-seam mining because of seam interaction problems. The size of the yield pillar was determined by satisfying several design requirements, as well as by limited test mining; test results showed good, medium-term stability for the yield pillars, with a possible need for rib control. It was shown that the yield pillars might be effective in controlling the floor heave, and could minimize interaction problems in two-seam mining.
Gate road layout design for two-seam longwall mining
Summary Results of instrumentation, test mining and computer aided stability analyses were combined to design the most stable gate road layout for two-seam longwall mining at the Plateau Mining Company. Five layouts were evaluated; these layouts used a combination of yield and/or large pillars with either three-entry or two-entry development systems. A layout which used a yield pillar within a two-entry development system resulted in the most stable gate roads for two-seam mining. Another layout using a yield and large pillar was shown to be most stable for single-seam mining of the top seam, but it was unsuitable for two-seam mining because of seam interaction problems. The size of the yield pillar was determined by satisfying several design requirements, as well as by limited test mining; test results showed good, medium-term stability for the yield pillars, with a possible need for rib control. It was shown that the yield pillars might be effective in controlling the floor heave, and could minimize interaction problems in two-seam mining.
Gate road layout design for two-seam longwall mining
Maleki, H. N. (Autor:in) / Agapito, J. F. T. (Autor:in) / Wangsgard, M. (Autor:in) / Cort, J. (Autor:in)
1986
Aufsatz (Zeitschrift)
Englisch
BKL:
38.58
Geomechanik
/
57.00
Bergbau: Allgemeines
/
56.20
Ingenieurgeologie, Bodenmechanik
Lokalklassifikation TIB:
275/3730/4800
Mechanization of longwall mining in coal seam with soft floor strata
Engineering Index Backfile | 1969
|Longwall roof control in Arley seam
Engineering Index Backfile | 1932
|British Library Online Contents | 2016
|