Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Use of bored—cast-in-place piles in multistory building construction
Use of bored—cast-in-place piles in multistory building construction
Use of bored—cast-in-place piles in multistory building construction
Egorov, K. E. (Autor:in)
1991
Aufsatz (Zeitschrift)
Englisch
Lokalklassifikation TIB:
770/6545/8000
BKL:
56.20
Ingenieurgeologie, Bodenmechanik
Bored Cast in Place Concrete Test Piles in Clay Till
British Library Conference Proceedings | 1990
|Post-tensioned cast-in-place multistory building frame
Engineering Index Backfile | 1966
|Integrity of Bored Cast-In-Place Piles Constructed by Tripod Rigs
British Library Conference Proceedings | 2002
|On several principal problems in bored cast-in-place concrete piles
British Library Conference Proceedings | 2007
|Experimental investigations of bearing capacity of bored-cast-in-place tapered piles
Online Contents | 1990
|