Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concerning accounts for final and intermediate output in the construction of hydraulic structures (discussion)
Conclusions Organization of accounts for final and intermediate output in hydraulic construction is possible and economically expedient despite the long duration of the construction cycle.Only such elements or parts of structures whose period of completion of construction and assembly determine the start of subsequent operations at the rate specified by the technological construction schedule can be considered intermediate output.Accounts for intermediate output augment the progressive effect of planning and management of construction by means of network schedules and economically stimulate a reduction in construction time.The realization of accounts for final and intermediate output requires some reorganization of the existing instructions on drawing up estimates, planning, accounting, material stimulation, contracts, and financing of construction.
Concerning accounts for final and intermediate output in the construction of hydraulic structures (discussion)
Conclusions Organization of accounts for final and intermediate output in hydraulic construction is possible and economically expedient despite the long duration of the construction cycle.Only such elements or parts of structures whose period of completion of construction and assembly determine the start of subsequent operations at the rate specified by the technological construction schedule can be considered intermediate output.Accounts for intermediate output augment the progressive effect of planning and management of construction by means of network schedules and economically stimulate a reduction in construction time.The realization of accounts for final and intermediate output requires some reorganization of the existing instructions on drawing up estimates, planning, accounting, material stimulation, contracts, and financing of construction.
Concerning accounts for final and intermediate output in the construction of hydraulic structures (discussion)
Nemirovskii, M. I. (Autor:in)
1967
Aufsatz (Zeitschrift)
Englisch
BKL:
56.30
Wasserbau
Lokalklassifikation TIB:
770/6550/8000
Wiley | 2015
|Calculating prices and final accounts for housing construction
Taylor & Francis Verlag | 1993
|Discussion of Hydraulic-Fill Dam Construction
ASCE | 2021
|