Experiences in Operating the Principal Structures of the XXII Congress KPSS Volga Hydroelectric Station
Conclusions Observations of seepage, structure deformation, and reconfiguration of the channel, testify to the fact that the XXII Congress KPSS Volga HES, constructed on sandy siltstone rock, is functioning normally.Omission of quick-lowering gates in front of the turbines, and of individual stop gates in the HES forebay, has not caused complications in operation.The rubber seals between the concrete slabs, installed instead of filters beneath the concrete protective covering on the earth dam slopes, are functioning well.Multi-unit HES should be equipped with reliable totalizing instruments for computing flow through the turbines.
Experiences in Operating the Principal Structures of the XXII Congress KPSS Volga Hydroelectric Station
Conclusions Observations of seepage, structure deformation, and reconfiguration of the channel, testify to the fact that the XXII Congress KPSS Volga HES, constructed on sandy siltstone rock, is functioning normally.Omission of quick-lowering gates in front of the turbines, and of individual stop gates in the HES forebay, has not caused complications in operation.The rubber seals between the concrete slabs, installed instead of filters beneath the concrete protective covering on the earth dam slopes, are functioning well.Multi-unit HES should be equipped with reliable totalizing instruments for computing flow through the turbines.
Experiences in Operating the Principal Structures of the XXII Congress KPSS Volga Hydroelectric Station
Ivanov, M. A. (Autor:in)
1968
Aufsatz (Zeitschrift)
Englisch
BKL:
56.30
Wasserbau
Lokalklassifikation TIB:
770/6550/8000
The Volga—22nd Congress Hydroelectric Plant — 20 years
Springer Verlag | 1979
|The Volga—22nd Congress Hydroelectric Plant — 20 years
Online Contents | 1979
|