Organization of construction works at the “iron gate” hydro development on the Danube
Conclusions The main system of concreting the power house by means of three cable cranes, 15 tons each, and the lock by means of tower cranes was the correct choice. An alternative method for constructing the power house would be concreting by means of two parallel 15-ton cable cranes at one level and one 10-ton cable crane located over them along the entire length of the structure.Construction of the foundation sections and manufacture of the structural members, and also the assembly of the cable cranes simultaneous with the construction of the cofferdams, made it possible to begin concreting the structures immediately after draining the foundation pit and completing a small volume of excavation.The low cofferdams, up to 6 m high, in the form of sand-clay embankments, withstood the pressure nicely without special watertight diaphragms or blankets.In constructing similar hydro developments it is recommended to use reinforced structures in an even greater volume.The volume and number of precast reinforced-concrete elements assembled in the main structures proved to be sensible.The pioneer method of damming without constructing a bridge can be used confidently when damming rivers with a rock bottom at a discharge of a bout 3000 $ m^{3} $/sec and drop of 3.5 m.
Organization of construction works at the “iron gate” hydro development on the Danube
Conclusions The main system of concreting the power house by means of three cable cranes, 15 tons each, and the lock by means of tower cranes was the correct choice. An alternative method for constructing the power house would be concreting by means of two parallel 15-ton cable cranes at one level and one 10-ton cable crane located over them along the entire length of the structure.Construction of the foundation sections and manufacture of the structural members, and also the assembly of the cable cranes simultaneous with the construction of the cofferdams, made it possible to begin concreting the structures immediately after draining the foundation pit and completing a small volume of excavation.The low cofferdams, up to 6 m high, in the form of sand-clay embankments, withstood the pressure nicely without special watertight diaphragms or blankets.In constructing similar hydro developments it is recommended to use reinforced structures in an even greater volume.The volume and number of precast reinforced-concrete elements assembled in the main structures proved to be sensible.The pioneer method of damming without constructing a bridge can be used confidently when damming rivers with a rock bottom at a discharge of a bout 3000 $ m^{3} $/sec and drop of 3.5 m.
Organization of construction works at the “iron gate” hydro development on the Danube
Stoimirovich, Bogolyub (Autor:in)
1971
Aufsatz (Zeitschrift)
Englisch
BKL:
56.30
Wasserbau
Lokalklassifikation TIB:
770/6550/8000
Organization of construction works at the “iron gate” hydro development on the Danube
Springer Verlag | 1971
|Leixlip hydro-electric development, civil works construction
Engineering Index Backfile | 1948
|Organization of the construction of the Bureya hydro development
Online Contents | 1995
|Organization of the Construction of the Bureya Hydro Development
British Library Online Contents | 1995
|Dredge for the danube regulation works
Engineering Index Backfile | 1895