Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Conclusions The measures taken in recent years to increase the stability of the structures provide operational reliability at a sufficiently high level.The problems related mainly to improvement of the technologcial processes during maintenance works and improvement of the method of estimating the actual strength of the retaining walls that have occurred during 50-year operation of the canal require a fundamental solution without delay.
Conclusions The measures taken in recent years to increase the stability of the structures provide operational reliability at a sufficiently high level.The problems related mainly to improvement of the technologcial processes during maintenance works and improvement of the method of estimating the actual strength of the retaining walls that have occurred during 50-year operation of the canal require a fundamental solution without delay.
Reliability and safety inspection of hydraulic structures of the Moscow Canal
Ni, V. E. (Autor:in)
1987
Aufsatz (Zeitschrift)
Englisch
BKL:
56.30
Wasserbau
Lokalklassifikation TIB:
770/6550/8000
Reliability and safety inspection of hydraulic structures of the Moscow Canal
Springer Verlag | 1987
|Developmentof the safety monitoring system of hydraulic structuresof the Moscow canal
DOAJ | 2015
|Results of observing the state of hydraulic structures of the moscow canal
Springer Verlag | 1977
|Results of observing the state of hydraulic structures of the moscow canal
Online Contents | 1977
|Hydraulic tests for reconstructing the pumping stations on the Moscow Canal
Springer Verlag | 1987
|