Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Possibilities of constructing hydroelectric stations — pumped storage stations in Armenia
Conclusions Reconstruction of the Gyumush HES into a HES-PSS will make it possible to additionally obtain a peak capacity of 160 MW, which has great significance both from the viewpoint of the effective use of existing structures and equipment and an increase of prompt flexibility of the power system.
Possibilities of constructing hydroelectric stations — pumped storage stations in Armenia
Conclusions Reconstruction of the Gyumush HES into a HES-PSS will make it possible to additionally obtain a peak capacity of 160 MW, which has great significance both from the viewpoint of the effective use of existing structures and equipment and an increase of prompt flexibility of the power system.
Possibilities of constructing hydroelectric stations — pumped storage stations in Armenia
Rostomyan, V. B. (Autor:in) / Burnachyan, G. A. (Autor:in)
1989
Aufsatz (Zeitschrift)
Englisch
BKL:
56.30
Wasserbau
Lokalklassifikation TIB:
770/6550/8000
Possibilities of constructing hydroelectric stations — pumped storage stations in Armenia
Springer Verlag | 1989
|Economic efficiency of construction of pumped-storage hydroelectric stations
Online Contents | 1979
|Economic efficiency of construction of pumped-storage hydroelectric stations
Springer Verlag | 1979
|