Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Arcing time on the disconnected phase of a 500 KV overhead line during a single-phase automatic reclosing cycle
This an examination of discrepancies in data on the arc quenching time during single-phase short circuits in 500 kV overhead lines obtained by computation according to the theory of arc supply currents and actual data obtained over 15 years by the Integrated Dispatcher Control of Siberia.
Arcing time on the disconnected phase of a 500 KV overhead line during a single-phase automatic reclosing cycle
This an examination of discrepancies in data on the arc quenching time during single-phase short circuits in 500 kV overhead lines obtained by computation according to the theory of arc supply currents and actual data obtained over 15 years by the Integrated Dispatcher Control of Siberia.
Arcing time on the disconnected phase of a 500 KV overhead line during a single-phase automatic reclosing cycle
Raskovalov, Yu. V. (Autor:in) / Lir, E. A. (Autor:in)
2010
Aufsatz (Zeitschrift)
Englisch