Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Development and operation of unit 3 at the Kashira GRÉS
Initial results on the development and operation of the 330 MW pulverized-coal fired unit at the Kashira GRÉS are reported. The major performance indices are close to the design values. The remaining unsolved issues are singled out.
Development and operation of unit 3 at the Kashira GRÉS
Initial results on the development and operation of the 330 MW pulverized-coal fired unit at the Kashira GRÉS are reported. The major performance indices are close to the design values. The remaining unsolved issues are singled out.
Development and operation of unit 3 at the Kashira GRÉS
Torkhunov, S. F. (Autor:in) / Shvarts, A. L. (Autor:in) / Avrutsky, G. D. (Autor:in) / Verbovetskii, E. Kh. (Autor:in) / Boksha, A. K. (Autor:in) / Vereshchitin, V. A. (Autor:in) / Somov, A. A. (Autor:in) / Chugreev, A. A. (Autor:in)
2012
Aufsatz (Zeitschrift)
Englisch
Development and operation of unit 3 at the Kashira GRÉS
Online Contents | 2012
|Development and operation of unit 3 at the Kashira GRÉS
Springer Verlag | 2012
|British Library Online Contents | 1992
Une nouvelle construction en Grès
DataCite | 1903
|