Time-dependent behaviour of widened reinforced concrete under-bridge
Abstract The paper reports on data acquired during 700 days of monitoring a widened reinforced concrete underbridge. The deck was monitored before, during and after widening and both portions of the deck, existing and new, were instrumented. Concrete strains were monitored by means of embedment and surface Vibrating Wire strain Gauges (VWG). Predicted creep, shrinkage, thermal and settlement strains were evaluated by means of a finite element analysis. The creep and shrinkage factors used were those from the simplified form of the B3 model [1]. Good agreement between calculated and measured longterm strains was observed at almost all gauge positions. From the analysis carried out, it was found that the stresses from the time dependent phenomena of creep, shrinkage and temperature, combined with those from the settlement of abutments, were greater than the magnitude of stresses obtained from the design live load.
Time-dependent behaviour of widened reinforced concrete under-bridge
Abstract The paper reports on data acquired during 700 days of monitoring a widened reinforced concrete underbridge. The deck was monitored before, during and after widening and both portions of the deck, existing and new, were instrumented. Concrete strains were monitored by means of embedment and surface Vibrating Wire strain Gauges (VWG). Predicted creep, shrinkage, thermal and settlement strains were evaluated by means of a finite element analysis. The creep and shrinkage factors used were those from the simplified form of the B3 model [1]. Good agreement between calculated and measured longterm strains was observed at almost all gauge positions. From the analysis carried out, it was found that the stresses from the time dependent phenomena of creep, shrinkage and temperature, combined with those from the settlement of abutments, were greater than the magnitude of stresses obtained from the design live load.
Time-dependent behaviour of widened reinforced concrete under-bridge
Hosseini, M. (Autor:in) / Jefferson, A. D. (Autor:in)
1998
Aufsatz (Zeitschrift)
Englisch
Time-dependent behaviour of widened reinforced concrete under-bridge
British Library Online Contents | 1998
|Time-dependent behaviour of widened reinforced concrete under-bridge
Springer Verlag | 1998
|TECHNICAL REPORTS - Time-dependent behaviour of widened reinforced concrete under-bridge
Online Contents | 1998
|Railroad bridge widened and reinforced
Engineering Index Backfile | 1923
|Dam bridge widened over spillway
Engineering Index Backfile | 1941