Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tolerance of cavitation damages in developing requirements for spillway surfaces at the Irgana hydroproject
Basic information on the in-service tunnel spillway at the Irgana HPP, and also requirements for smoothing irregularities in its surfaces in contact with the flow are presented. A method is proposed for determination of requirements for the surface of the spillway with a tolerance for cavitation damages. Results of experimental investigations and analyses are presented.
Tolerance of cavitation damages in developing requirements for spillway surfaces at the Irgana hydroproject
Basic information on the in-service tunnel spillway at the Irgana HPP, and also requirements for smoothing irregularities in its surfaces in contact with the flow are presented. A method is proposed for determination of requirements for the surface of the spillway with a tolerance for cavitation damages. Results of experimental investigations and analyses are presented.
Tolerance of cavitation damages in developing requirements for spillway surfaces at the Irgana hydroproject
Abdarakhmanov, M. A. (Autor:in) / Kostin, V. V. (Autor:in) / Nikulin, D. A. (Autor:in) / Shvainshtein, A. M. (Autor:in) / Korotkov, N. N. (Autor:in) / Shkuropat, A. G. (Autor:in)
2011
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
BKL:
56.30
Wasserbau
/
56.30$jWasserbau
Development of the design for the No. 2 spillway at the Boguchany hydroproject
Online Contents | 2009
|Development of the design for the No. 2 spillway at the Boguchany hydroproject
Springer Verlag | 2009
|Development of the design for the No. 2 spillway at the Boguchany hydroproject
Online Contents | 2009
|Hydroproject Institute in Vietnam
Online Contents | 2000
|