Abstract Excavating metro tunnels using TBMs poses several challenges, especially when it comes to passing through excavated stations. It is difficult to build support structures and push frames to move a TBM across a station box and relaunch it at the other end. To address this issue, our paper proposes a method that involves using multi-segmented concrete rings. These partial rings provide the necessary support to push the TBM forward, allowing us to take advantage of the segmental support method without having to build complete rings within the station space. Our study found that TBM can be relaunched with both five-segmented and six-segmented supports, but the latter is the better option. We tested the proposed method in multiple stations along Line 6 of the Tehran Metro project. The results showed that the method is effective and does not cause any unacceptable deviation. In conclusion, we confidently recommend this method for similar projects encountering the challenge of building support structures and push frames to move a TBM across a station box and relaunch it at the other end.
A Segmental Support Method for the Passage of TBMs Through Excavated Metro Stations
Abstract Excavating metro tunnels using TBMs poses several challenges, especially when it comes to passing through excavated stations. It is difficult to build support structures and push frames to move a TBM across a station box and relaunch it at the other end. To address this issue, our paper proposes a method that involves using multi-segmented concrete rings. These partial rings provide the necessary support to push the TBM forward, allowing us to take advantage of the segmental support method without having to build complete rings within the station space. Our study found that TBM can be relaunched with both five-segmented and six-segmented supports, but the latter is the better option. We tested the proposed method in multiple stations along Line 6 of the Tehran Metro project. The results showed that the method is effective and does not cause any unacceptable deviation. In conclusion, we confidently recommend this method for similar projects encountering the challenge of building support structures and push frames to move a TBM across a station box and relaunch it at the other end.
A Segmental Support Method for the Passage of TBMs Through Excavated Metro Stations
Eftekhari, Mosleh (Autor:in) / Bastami, Mehdi (Autor:in)
2023
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
BKL:
57.00$jBergbau: Allgemeines
/
38.58
Geomechanik
/
57.00
Bergbau: Allgemeines
/
56.20
Ingenieurgeologie, Bodenmechanik
/
38.58$jGeomechanik
/
56.20$jIngenieurgeologie$jBodenmechanik
Steel Fiber Segmental Linings for Mega TBMs
British Library Conference Proceedings | 2019
|Expanding the Madrid Metro using 6 TBMs
British Library Online Contents | 1997
|PRAGUE METRO - Prague Metro's return to TBMs
Online Contents | 2012
Online Contents | 2006